MOUNTAINVIEW CO-OP PORT MOODY

New low slope roof membrane assemblies.

Design development consultation to prime consultant, Field Reviews during construction, Field inspections for the purposes of obtaining Roofing Contractors Association of British Columbia 5-year guarantee.

Read on.

Value: $200,000 completed - 2002

Replacement of all existing low slope roof membrane and pitched roof assemblies.

  • Preparation of Contract Documents (drawings specifications)
  • Field Reviews during construction
  • Administration of the construction contract
  • Read on.

Value: $75,000 completed - 2001

Installation of new exterior insulated green roof assembly.

Inspections under the RCABC guarantee program.

Read on.

Value: $85,000 completed - 2002

Replacement of all existing low slope roof membrane and pitched terracotta tile assemblies with metal tile.

  • Design development consultation to prime consultant.
  • Field Reviews during construction
  • Field inspections for the purposes of obtaining Roofing Contractors Association of British Columbia 5-year guarantee.

Read on.

Value: $750,000 completed - 2002
EPSOM DOWNS SURREY

Replacement of 40,000 sq/ft of pitched asphalt shingle roof assemblies on a public housing complex located in Surrey,British Columbia.

  • Roof condition assessment
  • Preparation of Contract Documents (drawings specifications)
  • Field Reviews during construction
  • Inspections under the RCABC guarantee program
  • Administration of the construction contract

Read on.

Value: $200,000 completed - 2004
MCLEAN APARTMENTS VANCOUVER

Replacement of all existing low slope roof membrane assemblies.

  • Preparation of Contract Documents (drawings specifications)
  • Inspections under the RCABC guarantee program
  • Field Reviews during construction
  • Administration of the construction contract

Read on.

Value: $80,000 completed - 2002
GIBSONS PARK PLAZA SUNSHINE COAST

Replacement of a portion of existing low slope roof membrane assemblies on shopping mall in Gibson’s, B.C.

  • Preparation of Contract Documents (drawings specifications)
  • Field Reviews during construction
  • Administration of the construction contract

Read on.

Value: $250,000 completed - 2003

Replacement of all existing low slope roof membrane assemblies on Providence 1 tower.

  • Roof condition assessment
  • Preparation of Contract Documents (drawings specifications)
  • Field Reviews during construction
  • Inspections under the RCABC guarantee program
  • Administration of the construction contract

Read on.

Value: $550,000 completed - 2002